The person that put in the 2-post did a decent job (you can see the white cables out the back going into the ceiling from the patch panel(s?); looks fine) except that the vertical cable management has come loose at the top somehow.

I see what looks like one 2U horizontal cable manager in the middle? ... so I feel like they were set up for success mostly.

I'm pretty sure literally everyone after that point didn't "get it" in the slightest possible sense of the phrase.

Entertaining parts:

- A cable label... in the middle of the cable so you aren't distracted by information when unplugging it.

- 2-post mounted devices used as shelves because... they're flat?

- Is that a printer in the back right _on_top_of_an_old_Dell_desktop_!?!?!

On second (fifth?) review, I stand corrected. There are about 5 white cables coming out of the bottom-most patch panel that despite not going through the horizontal guide above, do seem to go mostly horizontal to the nearest vertical guide. Maybe that was intentional?

I feel like I could "fix" it with 2 2-post shelves, 6-7 2U horizontal cable guides, a middling quantity of 3-6 foot CAT6 (for overkill), and about 30 minutes of outage window (actual time required: notably higher). Any bids lower?

Sign in to participate in the conversation
CleverLibre Social

CleverLibre Social is an inclusive social instance for open discussion, learning, and community.
All cultures welcome.
Hate speech and harassment strictly forbidden.